

This week the cabinets and countertop were installed. As you can see from the pictures, we're still missing a few doors and some hardware but that part is almost done. Don Miller built the cabinets.

The cabinets over the washer and dryer area (they're still in the basement - not looking forward to hauling those up).

The mudroom locker thing I designed for Don to build. I still need to get the coat hooks installed.

Now we're waiting for the plumber to come out and hook up the sink and we'll be functional. Oh and the electrician (me) needs to wrap up a few things too. Did I mention we still have to haul the washer and dryer up from the basement?